Compare flats side by side
Two flats are rarely alike enough to judge on the asking price. Put up to 4 blocks next to each other and the differences that matter — the lease, the floor area, what each costs for every month you get — line up in a single column each.
| Block 408 Sembawang DriveSembawang · D27remove | |
|---|---|
| Median price, past 12 months | $740,000 |
| Price per sq ft | $529 psf |
| Based on | two sales |
| Lease remaining | 74 years |
| Lease began / runs to | 2001–2100 |
| Commonest flat type | Executive, 1399 sq ft |
| Cost per month of lease | $1,480 |
| Cost per sq ft, per year of lease | $13 |
| Cash needed up front | $204,700 |
| Monthly while repaying | $2,992 |
| Everything, over the whole lease | $1,313,942 |
| Nearest hawker centre | Bukit Canberra Hawker Centre810 m · 46 food stalls |
| Food shops within 400 m / 800 m | 47 / 183 |
The same flat type, side by side
A block median mixes whatever happened to sell. If one block traded two-room flats last year and another traded five-room ones, their medians are not comparing like with like — so here each flat type is given its own row, and a blank means that block sold none.
| Flat type | Block 408 |
|---|---|
| Executive | $470,000$336 psf · 1399 sq ft · 28 sales |
The sales behind the medians
The most recent transactions at each block, as HDB recorded them. Where a median rests on two or three sales, this is what those sales actually were.
Block 408 Sembawang Drive
| Sold | Type | Floor | Size | Price |
|---|---|---|---|---|
| Aug 2026 | Executive | 04 to 06 | 1399 | $720,000515 psf |
| March 2026 | Executive | 10 to 12 | 1399 | $760,000543 psf |
| Sept 2025 | Executive | 04 to 06 | 1399 | $752,000537 psf |
| July 2025 | Executive | 04 to 06 | 1399 | $720,000515 psf |
| April 2025 | Executive | 07 to 09 | 1399 | $745,000532 psf |
| Feb 2025 | Executive | 01 to 03 | 1399 | $750,000536 psf |
| Jan 2025 | Executive | 07 to 09 | 1399 | $749,688536 psf |
| Jan 2025 | Executive | 13 to 15 | 1399 | $788,000563 psf |
| Sept 2024 | Executive | 07 to 09 | 1399 | $765,000547 psf |
| May 2024 | Executive | 04 to 06 | 1399 | $700,000500 psf |